
Sidewalks & Driveways
Sidewalks, driveway approaches and ramps built to city standard, the kind that pass inspection the first time.
SCOPE
What the job includes
No fine print. If something is not on this list, we tell you before we start.
- New sidewalks and replacement
- Driveway approaches
- ADA pedestrian ramps
- Curb and gutter
- Base prep and forming
CAPABILITY
What we bring
What we actually handle on this kind of work.
EQUIPMENT WE USE
- Forming and finishing equipment
- Concrete saw
FAQ
About this work
What people ask us most about this specifically.
Why does a brand new sidewalk crack?
Almost always because of what is UNDERNEATH, not the concrete. If the base was not properly compacted, the ground gives way at one spot and concrete, which does not bend, breaks. The other reason is thickness: a walking sidewalk and a driveway a truck drives over do not call for the same thickness or the same reinforcement. That is why half the job is base prep and forming, before the mixer ever shows up.
What are those cut lines every few feet?
Those are control joints. Concrete shrinks a little as it cures and it is going to crack no matter what: that cannot be prevented. What can be decided is WHERE. The joint is a deliberately weakened line so the crack shows up there, straight and hidden, instead of running across the middle. A sidewalk with no joints is not better: it is one that will crack wherever it feels like.
What does the ADA standard require on a ramp?
The main thing is the slope: no steeper than 1 in 12, meaning one inch of rise per foot of run. It also needs a flat landing top and bottom, the sides have to be handled so nobody walks off the edge, and it gets the yellow bumpy plate (the detectable warning) where the ramp meets the street. The city inspector checks it, and if the slope is off it has to be demolished and repoured.
When can I walk on it or park on it?
Walking on it, next day. Driving a car onto it, not for about a week: concrete keeps gaining strength for days even though the top already looks hard and dry. Putting weight on it early is the easiest way to break in a new driveway with a crack. When we finish we give you the exact date based on the weather, because cold slows it down.
CONTACT
Get your quote
Tell us about your sidewalks & driveways job and we answer the same day.
ALSO
We also do
If your job needs several things, we do all of them ourselves.
Excavation & Earthwork
Excavation, trenching, grading and compaction. Residential lots and commercial sites.
See more →
Utilities: Water & Sewer
Water and wastewater service installs, street cuts, HMAC repair and restoration.
See more →
Demolition & Rock
Hydraulic hammers for hard Hill Country rock and controlled demolition.
See more →
Site Preparation
Lot clearing, access roads, erosion control and pad building.
See more →
Hauling
Our own trucks and lowboys: base, fill, debris and heavy equipment.
See more →